Thank you for your interest to view the below mentioned tender. If you want to view further details, download available tender documents, require bidding support, class 3 digital signature certificate, signing and encryption, vendor registration support and much more, click Download Tender Document link.

Basic tender information about # 14107370

Removal And Re Fixing Of Insulation And Liner Plate Of Whr Hotspot Rectification Work # K Station Japs. Period Of Work 04 Days During Unit Shut Down Scope Of Work ·#Moilize The Laor, Equipment, Tools, Etc. On 24 Hrs. Notice Period ·#Remove The Liner Plate I N The Designated Areas. ·#Rethread The Plate-Fixing Stud M12. ·#Remove The Existing Insulation And Clean The Casing Surface. ·#Int Imate Dewa Personnel In Case Of Any Anormalities / Damages Found In The Oiler Casing Plate. ·#Install The New Insulation Lankets. ·# Contractor Shall Rectify Any Anormalities / Deformation Found In The Liner Plate. ·#In Case Of Complete Damage Of The Liner Plate, D Ewa Will Supply New Liner Plate And Contractor Shall Faricate And Fix The Plate According To Site Conditions. ·#Fixthe Liner Plate And Ensure That Flue Gas Will Not Enter To Oiler Casing. ·#Fix The Nut And Washers Ack And Tack Weld The Nuts With Stud. ·#Housekeep The Area And Dispose Scrap Insulation As Per Dewa Instruction. ·#Jo Completion Acceptance Is Sujected To Dewa Personnel Inspection And Verification. ·#Sumit Work Completion Report With Clear Photos. Dewa Scope 1.#Scaffolding 2.#Electricity 3.#Water 4.#Insulatio N 5.#Liner Plate 4Ft X 8Ft 6.#M12 Stud & Nut Additional Requirements From Contractor ·#After Work Completion, Dewa Will Do The Th Ermographic Inspection. Contractor Shall Rectify Any Further Hotspots Oserved In The Same Area. ·#The Contractor Shall Rectify Any A Normalities / Damages Of Oiler Casing Due To Hotspot Oserved In A Period Of One Yearfrom The Date Of Jo Completion. Warranty ·#The Minimum Warranty Period For The Work Shall E Of One Year From The Date Of Completion Of Work Accepted Y Dewa. ·#In Case Of Any Damag E/Defect Of The Work Carried Out Under This Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Nece Ssary Repair Work And Rectify The Defect Within Short Period Without Affecting The Production Of Electricity And Water. General Ter Ms & Conditions ·#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access, Facilities, Complexities, Safety Measures Etc., Efore He Sumits His Id. ·#Contactor Shall Sumit Method Of Statement And Schedule Upon Receipt Of Po. ·#The Contractor Shall Ensurehousekeeping On A Daily Asis And The Contractor Shall E Responsile For All Waste Material Dispo Sals To Designated Places. ·#All Dewa Safety & Environment Policy, Rules And Regulation Shall E Followed At Work Site During The Exe Cution Of The Work. The Contractor#S Engineer Should E Familiar With Safety Regulations While Working In A Hazardous Area. ·#Scaffol Ding If Required Shall E Arranged Y Dewa. ·#Crane If Required Shall E Arranged Y Dewa. ·#All Rigging And Transporting Equipment Shou Ld E Arranged Y The Contractor. This Equipment Should E Duly Tested And Certified Y The 3Rd Party Inspection Agency And The Certific Ates Should E Produced On Demand. Qualified Rigger, Mechanics Should E Provided. ·#The Work Shall E Executed Under Dewa Supervisionand As Per Quality/Schedule Requirement. ·#Contractor#S Supervisor Shall E Availale At Site Throughout The Period Of Work. ·#Entry P Ermits For The Staff/Workers Should E Applied With Passport Copies Having Valid Visa. Persons, Whose Names Are Not Availale In The L Ist, Will Not E Allowed To Enter The Powerhouse. ·#Entry Permits For The Vehicle Should E Applied With Copies Of Vehicle Registratio N. ·#Dewa Will Arrange Necessary Ptw / Lc / Hwp From Operation, Chemical La / Fire Department Clearances To Carry Out The Scope Of W Ork Under This Contract. ·#The Contractor Upon Receiving The Work Permit Shall First Ensure A Safe Working Condition. ·#All The Pers Ons Should Wear All The Required Ppe While At Work. ·#All Material And Tools Rought In Shall E Declared At Powerstation Security Ga Te And The List Of These Items Shall E Signed Y Dewa Security. The Copies Of These Documents Shall E Lodged With Dewa Engineer In-Ch Arge On Daily Asis. This Document Will E The Asis For The Clearance Gate Pass To Take Them Out On Completion Of The Jo. ·#Service Air, Electricity And Water For Work At Dewa Site. It Is The Responsiility Of The Contractor To Have His Own Arrangement In Extendin G The Electricity And Water Utility To His Places Of Work Including Lighting

Download Document

Related Information

Location

Dubai - Dubai, United Arab Emirates

Tender No

2331801994

Tender Type

Contract

Important Dates

Published on

03 Sep, 2018

Submission Date

06 Sep, 2018

Opening Date

06 Sep, 2018

Key Values

Work Value

NA

EMD

NA

Document Fee

NA